Appearance and materials
Compare color, dimensions and materials with the approved reference. Identify which details are cosmetic and which affect how the product works.
Work through the product design, electronics and audio in one sample before production.
See the sampling process
Agree on the product experience first. Use the sample to turn those decisions into specifications both teams can review.
Review the intended age, target market, form, audio content and controls. Identify what still needs to be decided before sampling.
Check materials, sound and how the product responds in use. List revisions together so your team can review the next sample.
Agree on the approved sample, packaging and inspection requirements before confirming the order.
Watch an operator working with production equipment on the workshop floor. For your project, share any testing or documentation requirements while the sample is being planned.
Review the same sample and specification together so that changes can be recorded before an order is confirmed.
Compare color, dimensions and materials with the approved reference. Identify which details are cosmetic and which affect how the product works.
Confirm the recordings, playback order, volume and control behavior. For products with a microphone, agree on where and how you will evaluate speech pickup.
Confirm what goes in each package, language on the artwork, carton requirements and what inspectors should compare with the approved sample.
Record the sample revision and list open issues. Review changes to components, materials or packaging against the approved specification before proceeding.
See how to turn an approved sample into a practical production checklist.
Choose the starting point before agreeing on samples, tooling or a production quotation.
Start with an existing format when its enclosure, controls and core interaction suit your project. List changes to audio, colors, artwork and packaging separately. The first review should confirm which changes fit the platform and which need further engineering.
Use a new design brief when the shape, internal layout or interaction needs to change. Agree on feasibility work, prototype deliverables and approval stages before discussing production. Record tooling ownership and the files or parts included in the development scope.
Identify who supplies the character artwork, translations, recordings, packaging files and any third party approvals. Name the person who can approve each deliverable. A clear owner keeps a late content decision from becoming an unexplained engineering revision.
Describe what the first sample must prove. An appearance model, a working electronic prototype and a production reference each answer different questions. Agree which one you need and which decisions remain open afterwards.
Review these together so the physical product and the content develop against the same brief.
| Decision | What to supply | What the sample should demonstrate |
|---|---|---|
| Character and artwork | Views, dimensions, brand colors and licensed files | Appearance, print alignment and the position of character features |
| Audio and languages | Scripts, language list, track identifiers and recording owner | Pronunciation, timing, track order and playback volume |
| Controls and triggers | An action list with the expected response | Start, repeat, stop, interruption and mode switching |
| Materials and assembly | Material references, power preference and size constraints | Touch, component fit, access to controls and speaker placement |
| Packaging | Pack format, instructions, labels and sales channel requirements | How the item fits, what arrives in the box and how variants are identified |
| Market and handover | Target age, destination and required evidence | Which configuration is reviewed and which documents accompany it |
Each stage should leave a clear reference for the next team.
Describe the audience, setting and first interaction. Separate essential behavior from optional ideas. Review the available space, content requirements and assumptions about power or connectivity before an enclosure or fabric pattern is finalized.
Review dimensions, controls, speaker openings and the internal layout. For plush, consider the feel of the electronics through the fabric. For a rigid product, compare control access and assembly against the intended use.
Create a stable track map and approve a small set of representative recordings. Check that the electronics support the trigger sequence, playback behavior and update method you want. Keep audio revisions tied to the prototype version.
Use a written test list when the sample arrives. Group feedback by appearance, function and packaging. Identify which changes need another physical sample and which can be confirmed through updated files.
Confirm which parts need tooling and who owns it. Agree on the purpose and acceptance criteria of a pilot build before committing to a larger run. Record any limitations accepted at this stage.
Release production against the approved configuration. Confirm the inspection scope, package contents, labels and shipment documents. The receiving team should be able to match the delivered product with the approved reference.
One record should connect the design decision to the files and sample actually approved.
Retain the sample identifier, hardware configuration, artwork revision and loaded audio file list together. When packaging changes, update the pack reference in the same record so the team does not have to reconstruct what was approved.
Read the full sample approval checklist ↗Ask whether tooling, sample revisions and packaging are inside or outside the unit quote. Confirm whether the quantity applies to one color, one character or the combined order. Record the target delivery window with those assumptions.
Understand what sets a plush toy MOQ ↗Share a reference, the intended quantity and your target date so we can review the scope.